Gurney Elementary School - Facility Updates

Summer 2021

The District made HVAC upgrades to the building, adding cooling to all the classrooms that did not previously have air conditioning. The new systems eliminate viruses such as Covid-19 and influenza, eliminate odors, and increase efficiency of the filters.  The new system and ventilators also provide better air quality and reduce energy consumption.

Roof work was completed at both Gurney and the Comfort Station which sits to the west of the school along the soccer fields. 

An emergency generator was installed in the event of power loss.

Summer 2022
The gym and cafeteria received new lighting.  The cafeteria also received new flooring. Both spaces will receive upgrades to the acoustics to help create an enhanced learning environment.  Over the past five years, classroom floors continued to be improved. 

Gurney’s in-house maintenance team installed some additional wooden locker/cubbies to provide storage space for student items in some additional areas. 

The softball field on Gurney’s property also has a new scoreboard thanks to a donation from the Chagrin Falls Boosters.

A $20,000 update to the modular unit at Gurney extended its life as well

Safety and Security Improvements

Gurney now has an upgraded vestibule entrance, improved access control systems with hardware and technology to control access, and increased security camera coverage.  A recent grant from the State of Ohio will allow the District to upgrade and improve door hardware and door locking equipment among other areas of safety.

In 2022, a new building fire alarm system was installed to replace the aging system. 

Exterior site lighting was added recently so that there is new LED lighting on the entire property. 

Additional Projects

Paving improvements continue annually with overlay patching in key areas, replacement of needed areas along the concrete walkway, and sealcoating to protect the asphalt. 

In 2019, the District, in proactive cooperation with the Ohio EPA, added chlorination functioning to the water system.  This involved the installation of a 1,200 gallon mixing tank system. 

Lighting and Acoustical Panels Installed in Gym and Cafeteria

Lighting and Acoustical Panels Installed in gym and cafeteria

New Classroom Carpet as part of annual flooring renewal program

New classroom carpet as part of annual flooring renewal program

Improve paving and walkway improvements to extend the life of those systems

Improve paving and walkway improvements to extend the life of those systems

HVAC upgrades

HVAC upgrades

Fields Comfort Station - new roof installed

Fields Comfort Station - new roof installed

Back up power to critical systems (generator) and efficient cooling capacity to core classrooms

Back up power to critical systems (generator) and efficient cooling capacity to core classrooms

Seal coating, asphalt crack filling and repainting of lines

Seal coating, asphalt crack filling and repainting of lines